70Z02326C93210003 DAVIE DEFENSE INC. | $3,500,000,000.00 | 2026-02-10 to 2035-02-10 | TX 77554 | Department of Homeland Security THE PURPOSE OF THIS LETTER CONTRACT IS FOR THE DELIVERY OF FIVE (5) EACH MULTI-PURPOSE POLAR SHIP (MPPS-100) VESSELS HEREAFTER REFERRED TO AS ARCTIC SECURITY CUTTERS (ASCS). |
FA881018C0006 NORTHROP GRUMMAN SYSTEMS CORPORATION | $3,485,513,539.13 | 2018-06-25 to 2031-04-11 | CA 90278 | Department of Defense NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. |
NNM16AA02C AEROJET ROCKETDYNE OF DE, INC | $3,438,289,825.36 | 2015-11-01 to 2029-09-30 | CA 91304 | National Aeronautics and Space Administration IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. |
N0001922C0004 SIKORSKY AIRCRAFT CORPORATION | $3,431,922,895.96 | 2021-12-06 to 2028-12-31 | CT 06614 | Department of Defense CH-53K FRP LOT 7 LONG LEAD ITEMS |
FA283424CB002 SIERRA NEVADA COMPANY, LLC | $3,419,616,376.72 | 2024-04-26 to 2032-10-29 | CO 80112 | Department of Defense SURVIVABLE AIRBORNE OPERATIONS CENTER (SAOC) |
W31P4Q19C0076 RAYTHEON/LOCKHEED MARTIN JAVELIN JV | $3,389,676,383.48 | 2019-09-12 to 2028-10-31 | AZ 85756 | Department of Defense JAVELIN PRODUCTION CONTRACT AWARD TO INCLUDE THE ALL UP ROUNDS (AUR), BATTERY COOLANT UNITS (BCU), AND JAVELIN VEHICLE LAUNCHER ELECTRONICS (JVL-E). |
FA865925CB003 RAYTHEON COMPANY | $3,381,835,581.16 | 2025-07-31 to 2030-05-30 | AZ 85756 | Department of Defense ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM)LOTS 39-40 |
N0002419C2114 BECHTEL PLANT MACHINERY, INC. | $3,376,284,837.00 | 2018-11-30 to 2032-09-30 | PA 15146 | Department of Defense NAVAL REACTORS |
N0002416C2427 HUNTINGTON INGALLS INCORPORATED | $3,373,813,422.40 | 2016-06-30 to 2026-12-31 | MS 39567 | Department of Defense DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL) |
N0002418C2301 LOCKHEED MARTIN CORPORATION | $3,366,427,733.39 | 2018-03-02 to 2031-06-30 | MD 21220 | Department of Defense MMSC DETAILED DESIGN AND CONSTRUCTION |
N0002424C2301 NATIONAL STEEL AND SHIPBUILDING COMPANY | $3,364,669,843.00 | 2024-09-09 to 2036-01-17 | CA 92113 | Department of Defense T-AO 214 - 221 DD&C BLOCK BUY |
N0002413C2307 HUNTINGTON INGALLS INCORPORATED | $3,345,822,881.00 | 2013-06-03 to 2027-03-31 | MS 39567 | Department of Defense FY13-FY17 DDG 51 CLASS SHIP CONSTRUCTION. |
75FCMC22C0038 MAXIMUS FEDERAL SERVICES, INC. | $3,314,910,843.00 | 2022-08-31 to 2027-09-10 | VA 22102 | Department of Health and Human Services CONTACT CENTER OPERATIONS |
N0002406C2303 BATH IRON WORKS CORPORATION | $3,309,817,048.63 | 2006-08-08 to 2021-12-26 | ME 04530 | Department of Defense DDG 1000 DETAIL DESIGN |
W52P1J21F0454 KBR SERVICES, LLC | $3,308,165,690.88 | 2021-08-14 to 2022-03-12 | TX 77002 | Department of Defense TASK ORDER AWARD FOR LOGCAP SUPPORT TO OPERATION ALLIES REFUGE FOR SUPPORT AT FT. BLISS, TX FT. MCCOY, WI FT. PICKETT, VA AND CAMP ATTERBURY, IN. |
HQ085124C0001 RAYTHEON COMPANY | $3,306,674,950.00 | 2024-07-25 to 2031-02-28 | AZ 85756 | Department of Defense FY 23-25 SM-3 BLOCK IIA AURS |
NSFDACS1219442 LEIDOS, INC. | $3,279,484,506.76 | 2011-12-23 to 2027-09-30 | | National Science Foundation SCIENCE OPERATION AND MAINTENANCE SUPPORT FOR THE UNITED STATES ANTARCTIC PROGRAM |
DESC0014664 OAK RIDGE ASSOCIATED UNIVERSITIES, INCORPORATED | $3,251,068,889.53 | 2016-03-10 to 2027-09-30 | TN 37831 | Department of Energy IGF::OT::IGF MANAGEMENT OF THE OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION |
80MSFC20C0034 SPACE EXPLORATION TECHNOLOGIES CORP. | $3,229,285,063.07 | 2020-05-13 to 2033-07-29 | CA 90250 | National Aeronautics and Space Administration WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. |
N0002420C2437 HUNTINGTON INGALLS INCORPORATED | $3,155,706,261.00 | 2020-04-30 to 2030-12-31 | MS 39567 | Department of Defense LHA 9 ADVANCE PROCUREMENT |
FA820523F0501 LOCKHEED MARTIN CORPORATION | $3,151,796,947.68 | 2023-01-01 to 2033-06-30 | TX 76108 | Department of Defense COMPREHENSIVE F-22 AIR VEHICLE SUSTAINMENT SERVICES. |
N0002413C2128 ELECTRIC BOAT CORPORATION | $3,145,999,614.00 | 2012-12-21 to 2022-01-11 | CT 06340 | Department of Defense SUBMARINE RDT&E |
N0001924C0032 RAYTHEON COMPANY | $3,145,330,978.00 | 2024-09-27 to 2029-09-29 | AZ 85756 | Department of Defense LOT 24-26 PRODUCTION - FMS |
FA880810C0001 THE BOEING COMPANY | $3,130,958,358.39 | 2010-08-19 to 2029-01-31 | CA 90245 | Department of Defense WGS BLOCK II FOLLOW ON |
DEAC0506OR23177 JEFFERSON SCIENCE ASSOCIATES, LLC | $3,122,899,691.31 | 2006-04-17 to 2026-05-31 | VA 23606 | Department of Energy TAS::89 0222::TAS MANAGEMENT AND OPERATION OF THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY. |
HQ027610C0001 LOCKHEED MARTIN CORPORATION | $3,093,078,488.95 | 2009-10-01 to 2025-12-31 | NJ 08057 | Department of Defense AEGIS BMD INTERNATIONAL SUPPORT |
N6274223F4007 DRAGADOS/HAWAIIAN DREDGING/ORION JV | $3,071,394,028.15 | 2023-03-31 to 2027-09-30 | HI 96860 | Department of Defense FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII |
W52P1J19F0402 V2X SYSTEMS LLC | $3,067,015,852.90 | 2019-04-12 to 2026-12-21 | | Department of Defense LOGISTICS CIVIL AUGMENTATION PROGRAM (LOGCAP) V AWARD FOR IRAQ. |
N0002417C2105 HUNTINGTON INGALLS INC | $3,043,319,134.12 | 2017-09-01 to 2021-08-21 | VA 23607 | Department of Defense FY17 RCOH ACCOMPLISHMENT |
N0001914C0050 SIKORSKY AIRCRAFT CORPORATION | $3,010,046,248.88 | 2014-05-07 to 2026-12-31 | CT 06614 | Department of Defense IGF::OT::IGF PRESIDENTIAL HELICOPTER REPLACEMENT PROGRAM (VXX) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) PHASE OF THE PROGRAM. THE CONTRACT ALSO INCLUDES NOT-TO-EXCEED OPTION PRICES FOR LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP). |
N0002419C2115 BECHTEL PLANT MACHINERY, INC. | $3,004,573,964.00 | 2018-11-30 to 2033-09-30 | PA 15146 | Department of Defense S1B |
W31P4Q25F0080 LOCKHEED MARTIN CORPORATION | $2,991,338,570.00 | 2025-06-23 to 2029-03-31 | TX 75051 | Department of Defense GUIDED MULTIPLE LAUNCH ROCKET SYSTEM (GMLRS) AND LOW COST REDUCED RANGE PRACTICE ROCKET (LCRRPR) FY26 RATE PRODUCTION LOT 21 DELIVERY. |
AIDOAATO1500009 CHEMONICS INTERNATIONAL, INC. | $2,990,215,080.32 | 2015-04-20 to 2027-11-28 | DC 20006 | Agency for International Development IGF::CL::IGF - GHSC IDIQ - MALARIA TASK ORDER |
80NM0018F0615 CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,985,859,580.98 | 2018-10-01 to 2028-09-30 | CA 91109 | National Aeronautics and Space Administration EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASAS DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8. JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS-STEM DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. |
N0002424C2115 BECHTEL PLANT MACHINERY, INC. | $2,980,051,797.00 | 2023-12-21 to 2035-09-30 | PA 15146 | Department of Defense S1B |
N0003024C0100 LOCKHEED MARTIN CORPORATION | $2,976,543,949.00 | 2024-09-12 to 2030-09-30 | FL 32780 | Department of Defense FY25 TRIDENT PRODUCTION AND DEPLOYED SYSTEMS SUPPORT |
N0002420C2300 MARINETTE MARINE CORPORATION | $2,952,523,292.00 | 2020-04-30 to 2034-05-31 | WI 54143 | Department of Defense DETAIL DESIGN AND CONSTRUCTION OF FFG(X) GUIDED MISSILE FRIGATE |
FA824018C7218 JT4 LLC | $2,894,778,405.20 | 2018-04-16 to 2026-09-30 | NV 89119 | Department of Defense JOINT RANGE TECHNICAL SERVICES (J-TECH II) |
W31P4Q24C0024 RAYTHEON COMPANY | $2,890,141,125.10 | 2024-07-31 to 2031-08-31 | MA 01810 | Department of Defense UNDEFINITIZED CONTRACT ACTION (UCA) FOR LOWER TIER AIR AND MISSILE DEFENSE SYSTEM (LTAMDS) |
FA861512C6016 LOCKHEED MARTIN CORPORATION | $2,881,255,653.08 | 2012-09-28 to 2026-12-31 | TX 76108 | Department of Defense TAIWAN F-16 A/B BLOCK 20 RETROFIT PROGRAM |
N0001907C0097 LOCKHEED MARTIN CORPORATION | $2,870,976,998.80 | 2007-07-27 to 2016-07-06 | TX 76101 | Department of Defense JSF LRIP LOT II - AAC |
MSFC0199911DNAS800016 LOCKHEED MARTIN CORP | $2,870,112,487.23 | 2000-10-27 to 2013-02-28 | LA 70129 | National Aeronautics and Space Administration PRODUCTION AND O&M FOR 35 EXTERNAL TANKS |
W58RGZ22C0022 AIRBUS US SPACE & DEFENSE INC | $2,855,969,611.08 | 2022-07-01 to 2027-10-18 | VA 22209 | Department of Defense THIS CONTRACT IS FOR THE FIRM-FIXED PRICE UH-72 LAKOTA HELICOPTER CONTRACTOR LOGISTICS SUPPORT AND ENGINEERING SERVICES WITH A BASE YEAR (6 MONTHS), FOUR ONE-YEAR OPTIONS, AND A SIX MONTH EXTENSION UNDER FAR CLAUSE 52.217-8. |
80MSFC20C0052 THE BOEING COMPANY | $2,844,683,081.00 | 2019-10-16 to 2029-02-28 | AL 35824 | National Aeronautics and Space Administration SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC) |
70B01C26F00000017 FISHER SAND & GRAVEL CO | $2,833,494,611.70 | 2025-12-17 to 2028-08-31 | AZ 85611 | Department of Homeland Security CONSTRUCT VERTICAL BORDER BARRIER |
W31P4Q24F0165 LOCKHEED MARTIN CORPORATION | $2,810,581,995.35 | 2024-07-01 to 2028-11-30 | TX 75051 | Department of Defense GUIDED MULTIPLE LAUNCH ROCKET SYSTEM (GMLRS) AND LOW COST REDUCED RANGE PRACTICE ROCKET (LCRRPR) FY25 FULL RATE PRODUCTION LOT 20 DELIVERY ORDER |
N0002417C2301 AUSTAL USA, LLC | $2,808,192,322.40 | 2017-06-23 to 2030-09-30 | AL 36610 | Department of Defense CONSTRUCTION OF LCS FLIGHT 0+ SHIP |
FA850512C0001 THE BOEING COMPANY | $2,806,532,949.46 | 2012-06-22 to 2021-04-30 | TX 78226 | Department of Defense IGF::OT::IGF F-15S/SA CONVERSION |
HQ027615C0003 RAYTHEON COMPANY | $2,762,910,244.93 | 2015-07-22 to 2025-12-31 | AZ 85756 | Department of Defense SM-3 BLK IIA RDT&E GUIDED MISSILE ROUNDS |
HQ086220C0002 RAYTHEON COMPANY | $2,738,795,020.04 | 2020-06-26 to 2032-08-31 | MA 01801 | Department of Defense KSA FMS ARMY NAVY TRANSPORTABLE RADAR SURVEILLANCE AND CONTROL MODEL 2 (AN/TPY-2) PRODUCTION |