HQ085120C0002 RAYTHEON COMPANY | $2,146,820,638.12 | 2020-03-27 to 2027-03-26 | AZ 85756 | Department of Defense SM-3 BLK IB ALL UP ROUNDS |
70Z02326C93210002 BOLLINGER SHIPYARDS LOCKPORT, L.L.C. | $2,142,956,960.00 | 2025-12-26 to 2030-12-25 | LA 70374 | Department of Homeland Security LETTER CONTRACT AWARD OF ARCTIC SECURITY CUTTERS |
HQ027610C0005 RAYTHEON COMPANY | $2,141,151,663.63 | 2010-09-01 to 2022-06-30 | AZ 85756 | Department of Defense BLOCK IIA AUR PRELIMINARY DESIGN |
W15QKN19C0017 RAYTHEON COMPANY | $2,138,494,906.24 | 2019-04-30 to 2028-01-31 | AZ 85756 | Department of Defense EXCALIBUR IB PRODUCTION BASE AWARD |
36C10B22N0051EHRM ORACLE HEALTH GOVERNMENT SERVICES, INC. | $2,120,623,737.86 | 2022-09-28 to 2027-03-31 | KS 66111 | Department of Veterans Affairs EHRM WAVES K, L, M (VISN 23) AND N, O (VISN 15) DEPLOYMENTS |
DEFE0011020 FLUOR FEDERAL PETROLEUM OPERATIONS, LLC | $2,112,195,603.19 | 2014-04-01 to 2025-12-31 | LA 70123 | Department of Energy IGF::OT::IGF MANAGEMENT AND OPERATION OF THE STRATEGIC PETROLEUM RESERVE FACILITIES. |
HSCG2316CAFR625 BOLLINGER SHIPYARDS LOCKPORT, L.L.C. | $2,099,442,660.08 | 2016-05-04 to 2027-09-24 | LA 70374 | Department of Homeland Security THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
FA862616C2138 GENERAL ELECTRIC COMPANY | $2,091,752,457.02 | 2016-06-30 to 2024-06-30 | OH 45215 | Department of Defense ADAPTIVE ENGINE TRANSITION PROGRAM (AETP) |
N0001918C1048 LOCKHEED MARTIN CORPORATION | $2,086,867,347.58 | 2018-05-24 to 2027-11-30 | TX 76108 | Department of Defense IS SUPPORT EQUIPMENT |
W31P4Q23C0036 RAYTHEON COMPANY | $2,064,842,083.00 | 2023-09-29 to 2030-09-30 | MA 01810 | Department of Defense REQUIREMENT FOR PATRIOT M903 LAUNCHING STATIONS. |
N0001920C0003 THE BOEING COMPANY | $2,058,655,011.17 | 2020-05-13 to 2029-06-29 | MO 63134 | Department of Defense SLAM ER OBSOLESCENCE REDESIGN - NRE AND PRODUCTION OF SLAM ER MISSILES |
FA863422F0035 THE BOEING COMPANY | $2,054,679,197.38 | 2022-09-29 to 2031-12-31 | MO 63134 | Department of Defense F-15EX - LOT 4 ADVANCED PROCUREMENT |
NNG09HR00C LOCKHEED MARTIN CORP | $2,032,829,134.57 | 2008-12-04 to 2039-04-30 | CO 80125 | National Aeronautics and Space Administration THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT. |
70B01C26C00000006 AMI METALS, INC | $2,022,176,160.58 | 2026-02-11 to 2028-12-31 | TX 79934 | Department of Homeland Security BULK STEEL FOR SOUTHWEST BORDER BARRIER CONSTRUCTION PROJECTS |
N0002419C2210 BOLLINGER MISSISSIPPI SHIPBUILDING, LLC | $2,019,738,356.06 | 2019-04-23 to 2030-05-01 | MS 39581 | Department of Defense POLAR SECURITY CUTTER #1 (FORMERLY HPIB) DETAIL DESIGN AND CONSTRUCTION |
80MSFC18C0011 AMENTUM TECHNOLOGY, INC. | $2,012,496,049.86 | 2017-12-01 to 2027-05-31 | AL 35812 | National Aeronautics and Space Administration ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA) |
DEAC2901AL66444 WASHINGTON TRU SOLUTIONS LLC | $2,007,900,739.80 | 2000-12-14 to 2012-09-30 | NM 88221 | Department of Energy MANAGEMENT AND OPERATION OF THE WASTE ISOLATION PILOT PLANT |
FA880812C0010 LOCKHEED MARTIN CORP | $2,007,479,973.14 | 2012-05-15 to 2022-01-24 | CA 94089 | Department of Defense IGF::CT::IGF AEHF SV5/6 PRODUCTION - UCA PARTS |
W58RGZ26C0003 THE BOEING COMPANY | $1,990,540,014.00 | 2025-10-27 to 2035-09-30 | PA 19078 | Department of Defense CH-47F BLOCK II AIRCRAFT WITH AIR TO AIR REFUELING INCLUSIVE OF ALL SERVICE, MATERIAL, PRODUCTION, AND MANUFACTURING FOR GERMANY, GY-B-XBT |
FA880615C0001 RANGE GENERATION NEXT LLC | $1,972,212,696.38 | 2014-11-06 to 2026-01-31 | VA 20166 | Department of Defense IGF::CT::IGF OPERATE, MAINTAIN, AND SUSTAIN LAUNCH AND TEST RANGE SYSTEM (LTRS) |
N0002406C2115 HUNTINGTON INGALLS INC | $1,957,373,076.00 | 2005-11-29 to 2009-03-13 | VA 23607 | Department of Defense
|
N0001919F2474 LOCKHEED MARTIN CORPORATION | $1,940,842,446.62 | 2018-11-14 to 2025-02-14 | TX 76108 | Department of Defense TECHNOLOGY REFRESH 3 (TR3) SYSTEM |
W911XK22C0006 KOKOSING ALBERICI TRAYLOR, LLC | $1,938,479,275.00 | 2022-06-30 to 2029-07-08 | MI 49783 | Department of Defense CONSTRUCTION OF THE NEW THIRD LOCK, NEW LOCK AT THE SOO, SAULT STE. MARIE, MICHIGAN. |
W56HZV12C0127 MANTECH ADVANCED SYSTEMS INTERNATIONAL, INC. | $1,930,816,943.62 | 2012-05-31 to 2020-11-20 | VA 22033 | Department of Defense IGF::OT::IGF CONTRACTOR LOGISTICS SUSTAINMENT AND SUPPORT (CLSS) SERVICES FOR THE MAINTENANCE REPAIR AND SUPPLY SUPPORT FOR ROUTE CLEARANCE VEHICLES (RCV), MINE RESISTANT AMBUSH PROTECTED (MRAP) VEHICLES, AND THE UNITED STATES SPECIAL OPERATIONS COMMAND (USSOCOM) VEHICLES (REFERRED TO AS THE MRAP FAMILY OF VEHICLES (FOV) OF (MRAP) FAMILY OF VEHICLES (FOV). |
W58RGZ19C0003 GENERAL ELECTRIC COMPANY | $1,927,538,509.98 | 2019-02-01 to 2029-12-31 | MA 01905 | Department of Defense REQUIREMENT IS TO DESIGN, DEVELOP, QUALIFY AND INTEGRATE AN IMPROVED TURBINE ENGINE (ITE) FOR THE EMD PHASE. |
N0001920C0032 LOCKHEED MARTIN CORPORATION | $1,904,520,982.28 | 2020-07-17 to 2029-12-30 | TX 76108 | Department of Defense SUPPORT EQUIPMENT, AUTONOMIC LOGISTICS INFORMATION SYSTEM HARDWARE, TRAINING SYSTEMS, SITE ACTIVATIONS, INTEGRATED CONTRACTOR SUPPORT, AND THE RELIABILITY AND MAINTAINABILITY IMPROVEMENT PROGRAM FOR THE F-35 LIGHTNING II. |
N0002407C6119 RAYTHEON COMPANY | $1,904,305,418.03 | 2007-05-14 to 2018-09-30 | AZ 85756 | Department of Defense STANDARD MISSILE 3 |
N0002419C2235 NATIONAL STEEL AND SHIPBUILDING COMPANY | $1,897,345,725.07 | 2018-10-16 to 2027-08-23 | CA 92113 | Department of Defense EXPEDITIONARY SEA BASE (ESB) HULL 6 LLTM UCA |
89303925FEM400064 HANFORD TANK WASTE OPERATIONS & CLOSURE, LLC | $1,886,485,775.41 | 2025-02-24 to 2028-09-30 | WA 99352 | Department of Energy THE AWARD CONTINUES PERFORMANCE OF INTEGRATED TANK DISPOSITION CONTRACT VIA THE IMPLEMENTATION TASK ORDER, TO-02. |
W52P1J19F0398 V2X SYSTEMS LLC | $1,883,299,515.32 | 2019-04-12 to 2027-06-12 | | Department of Defense LOGISTICS CIVIL AUGUMENTATION PROGRAM (LOGCAP) V AWARD FOR PACOM-KWAJALEIN. |
N0001922C0041 LOCKHEED MARTIN CORPORATION | $1,881,132,733.77 | 2022-05-17 to 2027-03-31 | TX 76108 | Department of Defense F-35 DEVELOPMENTAL FOUNDATION CONTRACT 3 - THIS CONTRACT PROVIDES A FOUNDATION, IN SUPPORT OF F-35 DEVELOPMENTAL FLIGHT TEST AT EDWARDS AIR FORCE BASE, NAVAL AIR STATION PATUXENT RIVER, AND F-35 DEVELOPMENTAL LABORATORY FACILITIES. |
DEAC0476DP00656 GENERAL ELECTRIC CO | $1,874,374,490.91 | 1979-09-30 to 2005-06-28 | FL 33773 | Department of Energy OPERATION OF PINELLAS PLANT |
HQ027615C0005 RAYTHEON COMPANY | $1,860,890,363.03 | 2015-04-30 to 2025-12-31 | AZ 85756 | Department of Defense FY15 SM-3 BLK IB ALL UP ROUNDS (AUR) |
N0001918C1012 THE BOEING COMPANY | $1,843,827,977.96 | 2018-08-30 to 2028-12-30 | MO 63134 | Department of Defense MQ-25 EMD |
19AQMM18C0185 GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $1,842,639,352.42 | 2019-06-19 to 2029-08-07 | VA 22150 | Department of State GLOBAL SECURITY ENGINEERING&SUPPLY CHAIN SERVICES. |
DOCDG133E09CN0094 L3HARRIS TECHNOLOGIES, INC. | $1,826,088,581.86 | 2009-05-27 to 2024-01-31 | FL 32902 | Department of Commerce THE PURPOSE OF THIS CONTRACT IS TO DEVELOP THE GROUND SYSTEM THAT WILL SUPPORT NOAA S NEXT GENERATION GEOSTATIONARY SATELLITE SERIES, GOES-R. THIS NEW SERIES OF SPACECRAFT, SET TO BEGIN LAUNCHING IN 2015, IS EXPECTED TO DOUBLE THE CLARITY OF TODAY S SATELLITE IMAGERY AND PROVIDE AT LEAST 20 TIMES MORE ATMOSPHERIC OBSERVATIONS FROM SPACE. THE CONTRACTOR IS TO DESIGN, DEVELOP, TEST AND IMPLEMENT THE GOES-R GROUND SYSTEM. THE GROUND SYSTEM WILL CAPTURE DATA FROM THE GOES-R SATELLITES, AND PROCESS AND DISTRIBUTE THE INFORMATION TO OPERATIONAL USERS. |
N4008521C0077 381 CONSTRUCTORS | $1,822,402,355.37 | 2021-08-13 to 2029-03-30 | ME 03904 | Department of Defense P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME |
W52P1J20C0005 ACCENTURE FEDERAL SERVICES LLC | $1,816,224,958.27 | 2019-12-10 to 2027-04-30 | VA 22203 | Department of Defense AWARD FOR UNIFIED ENTERPRISE RESOURCE PLANNING CAPABILITY SUPPORT SERVICES |
N0001919C0008 NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,810,662,428.42 | 2019-05-29 to 2029-01-31 | CA 92127 | Department of Defense MQ-4C TRITON LRIP LOT 5 LONG LEAD ITEMS TO SUPPORT U.S. NAVY AND COOPERATIVE PARTNER AUSTRALIA. |
N0002413C5116 LOCKHEED MARTIN CORPORATION | $1,809,820,245.23 | 2013-03-04 to 2025-03-31 | NJ 08057 | Department of Defense AEGIS COMBAT SYSTEM ENGINEERING AGENT (CSEA) ADVANCED CAPABILITY BUILD 16 (ACB 16), TECHNOLOGY INSERTION 16 (TI 16), FUTURE ACB/TI, BASELINE MAINTENANCE, TRAINING, AND STUDIES |
W56HZV20C0124 RENK AMERICA LLC | $1,805,160,827.64 | 2020-06-12 to 2025-12-11 | MI 49442 | Department of Defense UCA HARDWARE THOR III HMPT XMS AND ANCILLARY HARDWARE |
N0001916C0002 RAYTHEON COMPANY | $1,795,489,000.00 | 2016-04-13 to 2026-09-30 | CA 90245 | Department of Defense IGF::OT::IGF NEXT GENERATION JAMMER (NGJ) ENGINEERING&MANUFACTURING DEVELOPMENT (EMD) PHASE |
W56HZV23F0395 BAE SYSTEMS LAND & ARMAMENTS L.P. | $1,791,403,291.32 | 2023-08-31 to 2027-02-28 | PA 17408 | Department of Defense THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS. |
70B01C26F00000073 FISHER SAND & GRAVEL CO | $1,787,500,000.00 | 2026-01-07 to 2028-08-31 | NM 88020 | Department of Homeland Security DESIGN AND CONSTRUCT NEW VERTICAL BARRIER AND POWER DISTRIBUTION, LIGHTING, CAMERAS, EQUIPMENT SHELTERS AND LINEAR GROUND DETECTION SYSTEM (LGDS) IN HILDAGO COUNTY, NM. |
NNH15CN76C NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,780,030,031.31 | 2015-09-03 to 2029-05-31 | VA 20166 | National Aeronautics and Space Administration IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS |
75N91020F00003 LEIDOS BIOMEDICAL RESEARCH INC | $1,775,380,496.13 | 2020-08-31 to 2024-09-27 | MD 21702 | Department of Health and Human Services NCI OPERATIONAL TASK ORDER |
70B01C26F00000292 BARNARD CONSTRUCTION COMPANY, INCORPORATED | $1,770,847,986.00 | 2026-04-24 to 2028-08-31 | TX 79912 | Department of Homeland Security BORDER WALL CONSTRUCTION FOR EL PASO SECTOR - EPT-5 |
FA867515C0022 RAYTHEON COMPANY | $1,769,825,200.93 | 2014-12-22 to 2025-12-31 | AZ 85756 | Department of Defense ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 28-30 FY14-16 |
FA861517C6047 NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,766,712,058.11 | 2017-05-31 to 2029-01-29 | MD 21090 | Department of Defense F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED |
W31P4Q19C0003 NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,759,558,472.86 | 2019-03-13 to 2026-12-15 | AL 35805 | Department of Defense POLAND FMS THE INTEGRATED AIR AND MISSILE DEFENSE (IAMD) BATTLE COMMAND SYSTEM (IBCS). |